Beijing Borer Will Move Muck for New Rail Line
- The EPB will feature a spoke-type cutterhead and shaft-type screw conveyor
- Active articulation will be used for optimal performance through tight curves
- The eastern extension of Line 6 will add seven new stations and 12 km (7.5 mi) to the original 30 km (19 mi) line