Double Shield Will Move Muck Below Black River
- The TBM and conveyors will be assembled in a deep shaft using Onsite First Time Assembly (OFTA)
- Once complete, the tunnel will reduce storm water overflows into Lake Erie and curb basement flooding during heavy rains