Veteran TBM Carves Out
Collector Tunnel for Hydropower
- The first and only TBM ever to operate in the Faroes
- This TBM has excavated more than 30 km (18 mi) of hard rock in its lifetime
- The tunnel will collect water from 25 streams, increasing the annual capacity of the plant