Emisor Oriente - Lots 3, 4, and 5

Small World Map

Location

Mexico City, Mexico

Scope of Supply

3 x 8.9 m (29.2 ft) EPB TBMs, 3 Continuous Conveyor Systems, Cutters, Spares, Field Service

Tunnel Lengths

9.2 km (5.7 mi), 10.2 km (6.3 mi), 8.6 km (5.3 mi)

Ground Condition

Mixed Ground including Basalt, Volcanic Rock, Clay, Tuff, and Large Boulders

 

Mexico’s Largest Infrastructure Project
Will Halt Flooding in the Country’s Capital

  • Three Robbins EPBs are being used for Mexico’s largest infrastructure project
  • 62 km (39 mi) long urgent wastewater pipeline will prevent flooding of downtown areas
  • The machines are making swift advances in high pressure, mixed ground conditions