Hard Rock TBM to Curb Combined Sewer Overflows
- The refurbished TBM is designed with a new, back-loading cutterhead and 19-inch disc cutters to maximize cutter life
- The finished tunnel will capture up to 550 million gallons of wastewater per day from the city’s three largest Combined Sewer Overflows