Urban EPB Duo Will Advance
under Downtown San Francisco
- The two mixed ground EPBs will feature active articulation to drive through curves down to 140m (450 ft) radius
- The machines will be launched from a small shaft site on a downtown cobblestone street
- The Central Subway will linkup to Bay Area Rapid Transit (BART) and provide service between the Chinatown and Mission Bay areas