Hybrid TBM Assembled Onsite for Indian Water Tunnel
- A Hybrid EPB TBM was launched following Onsite First Time Assembly (OFTA)
- This is the first time the OFTA method has been used on a hybrid machine
- The TBM can operate as both an EPB and as a Single Shield TBM
- The Sleemanabad Carrier Canal will irrigate drought-prone Madhya Pradesh State