Thuong Kon Tum Hydropower Project

Keep Tunneling
Small World Map

Location

Kon Tum Province, Vietnam

Scope of Supply

4.5 m (14.8 ft) Main Beam TBM, Continuous Conveyor System, Cutters, Spares, Field Service

Tunnel Length

17.5 km (10.9 mi)

Ground Condition

Granite Biotite, Granitic Gneiss, Gneiss, Basalt

 

Onsite Assembly in Incredibly Remote Area

  • Project located 140 km from Ho Chi Minh, requiring 95 km of roadway to be built or reinforced
  • TBM, back-up, and continuous conveyor will be assembled using Onsite First Time Assembly (OFTA)
  • The hydropower scheme will be Vietnam's longest tunnel once complete