Yamanli II Hydroelectric Project

Small World Map

Location

Adana Province, Turkey

Scope of Supply

4.3 m (14.1 ft) Double Shield TBM

Tunnel Length

6.7 km (4.2 mi)

Ground Condition

Limestone

 

Double Shield to Excavate Headrace for Clean Energy

  • The headrace tunnel and power station will draw water from the Goksu River, with up to 81.3 MW annual generating capacity
  • The new station is part of a massive government initiative to develop clean energy sources in Eastern Turkey